日韩性视频-久久久蜜桃-www中文字幕-在线中文字幕av-亚洲欧美一区二区三区四区-撸久久-香蕉视频一区-久久无码精品丰满人妻-国产高潮av-激情福利社-日韩av网址大全-国产精品久久999-日本五十路在线-性欧美在线-久久99精品波多结衣一区-男女午夜免费视频-黑人极品ⅴideos精品欧美棵-人人妻人人澡人人爽精品欧美一区-日韩一区在线看-欧美a级在线免费观看

歡迎訪問 生活随笔!

生活随笔

當前位置: 首頁 > 编程资源 > 编程问答 >内容正文

编程问答

SAP S/4HANA生产订单状态含义

發布時間:2023/12/19 编程问答 33 豆豆
生活随笔 收集整理的這篇文章主要介紹了 SAP S/4HANA生产订单状态含义 小編覺得挺不錯的,現在分享給大家,幫大家做個參考.

REL: Released

Description

The object is released.

Use

If an object is released, this system status is set.
The status allows all actual and commited values to be posted to the object in question.

下面的流程會設置訂單的REL狀態:

上圖中的ISU, VBK是什么鬼?Object Category,Group of objects that are handled in a similar way within General Status Management.

那Process呢?稱為Business Transaction

Transaction that the user executes on the screen.

Objects that use general status management functions can define at business transaction level whether a function is allowed or not.

Examples

You execute a business transaction when you
(1) Post to a G/L account
(2) Release an order/project
(3) Post goods received
(4) Enter a confirmation

Group of objects that are handled in a similar way within General Status Management.
這些流程會移除訂單的REL狀態:

PRC Pre-costed

PRC Pre-costed

Definition

Indicates that a preliminary cost estimate exists for an order ( product cost collector or manufacturing order).

Dependencies

On the basis of the planned costs calculated in the preliminary cost estimate, you can do the following:
In Product Cost by Period you can valuate work in process at target costs.
You define this in Customizing for Product Cost by Period with the valuation variant for work in process and scrap.
You can valuate confirmed scrap quantities.
You define this in Customizing for Product Cost by Period or Product Cost by Order with the valuation variant for work in process and scrap.
You can calculate production variances.
For informational purposes, you calculate the production variances by comparing the actual costs with the target costs calculated on the basis of the planned costs. This information tells you which variances have occurred in production since the preliminary cost estimate of the order was created.

SETC Settlement rule created

Description

A settlement rule was created for the object.

Use

This status is set when settlement rules have been created for a controlling object (e.g. order, project).

要獲取更多Jerry的原創文章,請關注公眾號"汪子熙":

總結

以上是生活随笔為你收集整理的SAP S/4HANA生产订单状态含义的全部內容,希望文章能夠幫你解決所遇到的問題。

如果覺得生活随笔網站內容還不錯,歡迎將生活随笔推薦給好友。