日韩性视频-久久久蜜桃-www中文字幕-在线中文字幕av-亚洲欧美一区二区三区四区-撸久久-香蕉视频一区-久久无码精品丰满人妻-国产高潮av-激情福利社-日韩av网址大全-国产精品久久999-日本五十路在线-性欧美在线-久久99精品波多结衣一区-男女午夜免费视频-黑人极品ⅴideos精品欧美棵-人人妻人人澡人人爽精品欧美一区-日韩一区在线看-欧美a级在线免费观看

歡迎訪問 生活随笔!

生活随笔

當前位置: 首頁 > 编程资源 > 编程问答 >内容正文

编程问答

POD – Proof of Delivery

發布時間:2025/3/20 编程问答 20 豆豆
生活随笔 收集整理的這篇文章主要介紹了 POD – Proof of Delivery 小編覺得挺不錯的,現在分享給大家,幫大家做個參考.

Proof of delivery is the confirmation sent by the Ship to party upon the reciept of goods. Once you configure the POD in your system, means it wont let you

create the billing unless you have confirmatiion of POD.

To configure the POD :

————–Step 1————————————————————–

check the POD in Customer Master – sales area – Shipping data tab.


– Enter the time limit to recieve the POD from Ship to party in “Time Frame” as No: of days which is? permited in numbers and as I have entered as 3 days.

? If the Ship to party fails to send the POD within the stipulated time, which is mentioned in the time frame, the system will automatically create the

? Billing.

—————Step 2————————————————————

– Select the relavent Item category and assign “X” (Relavent for POD) you can use the following path to assign as mentioned.

?? (SPRO – Logistic Execution – Delivery – Proof of Deliveries – set POD-Relevance depending on delivery item category)


– If you intend to create the new reasons for the Quantity difference then you can do Under the previous step in customizing.

? (Define Reasons for Quantity Differences)

————–step 3————————————————————————

– Now create the Sales Order, delivery, PGI, and lastly when you will attempt to create the billing you would see the error message. In the log if you

observe the POD is not confirmed. Which means is you need to get the POD .


– To get the POD there are 2 scenarios.

Scenario 1-

If the quantity has difference ” it could be overdelivery or Underdelivery” for this:

A) Use the Transaction code VLPOD then enter the delivery document number: , enter the reasons for the qty variation (Positive or Negative) and finally

?? Enter the qty of variation under the “Qty difference sales Unit” which changes the POD status as “B”(Difference Reported). and save the document.


B) After the above step now you need to do VLPODQ transaction code for the final confirmation of POD- Automatic Confirmation.

?? In VLPODQ selection criteria, you need to input your delivery document no:,? and make sure to select “radio button of “Verified with difference”

?? and tick mark the “Display selected documents” under the worklist tab & Execute.

You can also do VLPODQ directly if there is no discripencies in the item which customers has recieved.


c) Select the line item and hit the “CONFIRM” button .


?? If you want to make sure you have the quantity difference recorded properly, for that go to VL02n, select the line item go to “Processing tab” and look in the

?? “POD Difference button” which will show up the delivery quantity and POD quantity.

D) Now you are ready for the billing… Go to VF01 and do the billing.



Scenario 2-

If there is no difference in quantity in suc case follow the step B (select the radio button “Not yet processed” instead of “verify with difference”.),

Step C, and D from above.

總結

以上是生活随笔為你收集整理的POD – Proof of Delivery的全部內容,希望文章能夠幫你解決所遇到的問題。

如果覺得生活随笔網站內容還不錯,歡迎將生活随笔推薦給好友。