日韩性视频-久久久蜜桃-www中文字幕-在线中文字幕av-亚洲欧美一区二区三区四区-撸久久-香蕉视频一区-久久无码精品丰满人妻-国产高潮av-激情福利社-日韩av网址大全-国产精品久久999-日本五十路在线-性欧美在线-久久99精品波多结衣一区-男女午夜免费视频-黑人极品ⅴideos精品欧美棵-人人妻人人澡人人爽精品欧美一区-日韩一区在线看-欧美a级在线免费观看

歡迎訪問 生活随笔!

生活随笔

當(dāng)前位置: 首頁 > 编程资源 > 编程问答 >内容正文

编程问答

Operation condition And timing analysis

發(fā)布時間:2025/7/14 编程问答 32 豆豆
生活随笔 收集整理的這篇文章主要介紹了 Operation condition And timing analysis 小編覺得挺不錯的,現(xiàn)在分享給大家,幫大家做個參考.

Operation condition 主要指芯片運行的環(huán)境的不同,在這里加上Interconnect net 模型.

?

Operating conditionDescription

Process derating factor?

This value is related to the scaling of device parameters resulting from variations in the fabrication process. A process number less than the nominal value usually results in smaller delays.?

Ambient temperature?

The chip temperature affects device delays. The temperature of the chip depends on several factors, including ambient air temperature, power consumption, package type, and cooling method.?

Supply voltage?

A higher supply voltage usually results in smaller delays.?

Interconnect model type?

This value defines an RC tree topology that PrimeTime uses to estimate net capacitance and resistance during prelayout analysis.?

?

當(dāng)Operation condition設(shè)置好只好,PT/DC/ICC/Encounter等可以根據(jù)R/C去計算pin-pin之間的延遲.

如何check Setup或者h(yuǎn)old就是analysis mode 的問題了.

主要包括以下三種:(源自User manual)

  • Single operating condition mode – Uses a single set of delay parameters for the entire design, based on one set of process, temperature, and voltage conditions.

  • On-chip variation (OCV) mode – Performs a conservative analysis that allows both minimum and maximum delays to apply to?different paths at the same time. For a setup check, it uses maximum delays for the launch clock path and data path, and minimum delays for the capture clock path. For a hold check, it uses minimum delays for the launch clock path and data path, and maximum delays for the capture clock path.

  • Advanced on-chip variation (AOCV) mode – Determines derating factors based on metrics of path logic depth and the physical distance traversed by a particular path.

?? 可以看到在OCV中,capture clock path使用best case, data path 使用worst case(對于Setup檢查). 當(dāng)某一段path既是clock path又是data path的時候.這段path具有雙重的屬性.這樣更加的pessimistic. ?For a more accurate analysis, this pessimism can be corrected. For more
information, see Clock Reconvergence Pessimism Removal.

轉(zhuǎn)載于:https://www.cnblogs.com/hucs/p/3910960.html

總結(jié)

以上是生活随笔為你收集整理的Operation condition And timing analysis的全部內(nèi)容,希望文章能夠幫你解決所遇到的問題。

如果覺得生活随笔網(wǎng)站內(nèi)容還不錯,歡迎將生活随笔推薦給好友。